The Shard

We supplied 5,500 cubic metres of ready mixed concrete that was poured continously over 32 hours in the UK’s largest ever concrete pour.

This was a hugely complex operation where there was a high cracking and shrinkage risk, due to heat build up during curing. This large concrete pour was expertly managed alongside the complicated wider logistics, to ensure the continuity of supply in the London's congested traffic.